Close Menu
Stratnews GlobalStratnews Global
    Facebook X (Twitter) Instagram
    Trending
    • OpenAI Microsoft Revenue Cap Set at $38 Billion
    • U.S. Senate To Debate Clarity Act Crypto Bill
    • Santa Clara County Sues Meta Over Scam Ads
    • Trump China Visit To Include Top US CEOs
    • China Prepares Tianzhou-10 Mission Launch
    • Defence Applications and Dilemma of Artificial Intelligence
    • China High-Tech Expo Showcases AI Advances
    • China Develops Hydrogen Fuel Cell Stack
    • Support Us
    Stratnews GlobalStratnews Global
    Write for Us
    Wednesday, May 13
    • Space
    • Science
    • AI and Robotics
    • Industry News
    • Support Us
    Stratnews GlobalStratnews Global
    Home » Rajasthan to Add 4,400 MW Coal Power Despite Renewable Energy Push

    Rajasthan to Add 4,400 MW Coal Power Despite Renewable Energy Push

    Arushi PandeyBy Arushi PandeyJanuary 20, 2026 World No Comments3 Mins Read
    Rajasthan Power

    Rajasthan to Add New Coal Power Capacity Despite Renewable Energy Lead

    India’s top renewable energy-producing state, Rajasthan, will require 4,400 megawatts (MW) of new coal-fired capacity by 2036 to meet growing electricity demand, even as it continues to expand its clean energy base, according to a government advisory document reviewed by Reuters.

    Coal Still Needed for Reliability

    The Central Electricity Authority (CEA), a think tank under India’s federal power ministry, has more than doubled its earlier estimate of Rajasthan’s coal-based power requirement from 1,900 MW to 4,400 MW, citing the need to replace ageing thermal plants and ensure stable power supply.

    The CEA’s letter, dated 27 November, was sent to the state’s power utility and highlighted the state’s plan to retire 1,350 MW of old coal projects. Rajasthan’s utility had previously argued that additional coal capacity was essential because renewable sources such as solar and wind could not yet provide uninterrupted power, and large-scale battery storage systems were still commercially unviable.

    The CEA did not respond to a Reuters request for comment on the letter.

    Balancing Renewables with Base Load

    Rajasthan, one of India’s leading producers of solar and wind power, currently sources about 70% of its electricity from renewables. However, with rising industrial and residential demand, the state faces challenges in maintaining grid stability during non-solar hours and periods of low wind generation.

    Following the CEA’s revised projections, the state’s power regulator has agreed to review its earlier decision to deny approval for a proposed 3,200 MW coal plant. Documents posted on the regulator’s website confirm that the reconsideration follows a request from the Rajasthan power utility.

    India’s broader energy strategy also reflects similar pressures. Despite its ambitious net-zero target for 2070 and a goal of achieving 500 gigawatts of renewable capacity, the country still relies heavily on coal, which accounts for roughly one-third of its power generation.

    Rising Demand Drives Coal Expansion

    Government projections show that national power consumption will continue to grow alongside economic expansion, requiring a 40% increase in coal-fired capacity to over 307 gigawatts by 2035. Several states have already accelerated plans to secure new coal power supply, emphasising the need for reliable baseload energy to complement intermittent renewables.

    Analysts say the dual-track approach highlights India’s challenge: expanding renewable energy while maintaining sufficient conventional capacity to ensure energy security. As Rajasthan and other states continue to balance these priorities, coal is likely to remain an integral part of the country’s power mix for at least another decade.

    with inputs from Reuters

    Author

    • Arushi Pandey
      Arushi Pandey
      View all posts
    Featured
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Reddit Telegram WhatsApp
    Arushi Pandey

      Keep Reading

      OpenAI Microsoft Revenue Cap Set at $38 Billion

      U.S. Senate To Debate Clarity Act Crypto Bill

      Santa Clara County Sues Meta Over Scam Ads

      Trump China Visit To Include Top US CEOs

      China Prepares Tianzhou-10 Mission Launch

      Defence Applications and Dilemma of Artificial Intelligence

      Add A Comment
      Leave A Reply Cancel Reply

      Anti Drone System (CUAS)
      Latest Posts

      OpenAI Microsoft Revenue Cap Set at $38 Billion

      May 13, 2026

      U.S. Senate To Debate Clarity Act Crypto Bill

      May 13, 2026

      Santa Clara County Sues Meta Over Scam Ads

      May 13, 2026

      Trump China Visit To Include Top US CEOs

      May 12, 2026

      China Prepares Tianzhou-10 Mission Launch

      May 12, 2026

      Defence Applications and Dilemma of Artificial Intelligence

      May 12, 2026

      China High-Tech Expo Showcases AI Advances

      May 12, 2026

      China Develops Hydrogen Fuel Cell Stack

      May 12, 2026

      Airbound Hybrid Drone Offers 40 KM Range

      May 12, 2026

      PM Narendra Modi Greets Nation on National Technology Day

      May 11, 2026

      Subscribe to News

      Get the latest sports news from NewsSite about world, sports and politics.

      • Astronomical Events
      • Space Missions
      • Industry News
      • Science
      StratNewsGlobal Tech
      Facebook X (Twitter) Instagram LinkedIn YouTube
      © 2026 StratNews Global, A unit of BharatShakti Communications LLP
      • About Us
      • Contributors
      • Copyright
      • Contact
      • Write for Us

      Type above and press Enter to search. Press Esc to cancel.