Close Menu
Stratnews GlobalStratnews Global
    Facebook X (Twitter) Instagram
    Trending
    • SpaceX IPO Could Top $1 Trillion as Investors Rush In
    • Time Names AI Architects as 2025 Person of the Year
    • NAACP Issues Framework to Prevent Bias in Healthcare AI
    • Cambridge Study Finds Fake Accounts Can Be Created for Just Cents
    • Caribbean Nations Unite to Harness Geothermal Energy Potential
    • U.S. Pushes to End Reliance on Chinese Lidar Technology
    • Trump Moves to Block Broadband Funds Over State AI Regulations
    Stratnews GlobalStratnews Global
    Write for Us
    Saturday, December 13
    • Space
    • Science
    • AI and Robotics
    • Industry News
    Stratnews GlobalStratnews Global
    Home » High-Speed Bullet Train Set to Cut Mumbai-Ahmedabad Travel Time by Hours

    High-Speed Bullet Train Set to Cut Mumbai-Ahmedabad Travel Time by Hours

    StratNewsGlobal Tech TeamBy StratNewsGlobal Tech TeamApril 10, 2025Updated:April 10, 2025 MegaProjects 2025 No Comments3 Mins Read
    Bullet Train

    A New Era of High-Speed Travel in India

    India is set to launch its first bullet train service through the ambitious Mumbai-Ahmedabad High-Speed Rail (MAHSR) project. Spanning around 508 kilometres, this modern rail corridor will link Mumbai, the financial hub of Maharashtra, with Ahmedabad, Gujarat’s largest city. Once complete, the train will cut travel time between the two cities from over seven hours to just over two.

    Trains on the route will operate at speeds of up to 320 km/h, using Japan’s renowned Shinkansen technology. This will place India among a select group of nations with dedicated high-speed rail infrastructure.

    Bullet Train Key Route Details and Stations

    The high-speed corridor will feature 12 stations, beginning at Mumbai’s Bandra Kurla Complex and ending at Sabarmati in Ahmedabad. The stations include Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, and Anand.

    Two service models are planned. A limited-stop service will complete the journey in approximately 2 hours and 7 minutes. An all-stations service will take around 2 hours and 58 minutes, still a major improvement over current travel times.

    Funding and Project Oversight

    The National High Speed Rail Corporation Limited (NHSRCL), formed in 2016, is leading the project. The estimated cost stands at ₹1.1 lakh crore (around US$15 billion). Over 80% of this is funded by Japan through a soft loan at a very low interest rate, highlighting the strategic collaboration between the two countries.

    Construction and Development Milestones

    Progress has accelerated in recent years. As of early 2025:

    • Land acquisition is fully complete.
    • 386 km of pier foundations and 272 km of viaducts are in place.
    • Construction includes a 7 km undersea tunnel under Thane Creek and several river bridges.

    The majority of the 508-kilometre track will be elevated—about 92%—with the rest consisting of tunnels and ground-level sections.

    Technological Innovations

    The MAHSR project will feature E5 Series Shinkansen trains, customised for Indian conditions. These trains are known for their safety, reliability, and energy efficiency. They also come with modern features to ensure a comfortable travel experience.

    Challenges and Expected Completion

    The project has faced hurdles such as land acquisition delays and the impact of the COVID-19 pandemic. However, construction has regained momentum. The first operational stretch between Surat and Bilimora is scheduled to open in 2026. Full operations across the corridor are expected by 2028.

    This high-speed rail project is set to revolutionise travel in western India. It will reduce travel time significantly while enhancing connectivity and boosting regional economic development.

     

    Author

    • StratNewsGlobal Tech Team
      StratNewsGlobal Tech Team

      View all posts
    Featured
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Reddit Telegram WhatsApp
    StratNewsGlobal Tech Team
    • Website

    Keep Reading

    SpaceX IPO Could Top $1 Trillion as Investors Rush In

    Time Names AI Architects as 2025 Person of the Year

    NAACP Issues Framework to Prevent Bias in Healthcare AI

    Cambridge Study Finds Fake Accounts Can Be Created for Just Cents

    Caribbean Nations Unite to Harness Geothermal Energy Potential

    U.S. Pushes to End Reliance on Chinese Lidar Technology

    Add A Comment
    Leave A Reply Cancel Reply

    Anti Drone System (CUAS)
    Latest Posts

    SpaceX IPO Could Top $1 Trillion as Investors Rush In

    December 12, 2025

    Time Names AI Architects as 2025 Person of the Year

    December 12, 2025

    NAACP Issues Framework to Prevent Bias in Healthcare AI

    December 12, 2025

    Cambridge Study Finds Fake Accounts Can Be Created for Just Cents

    December 12, 2025

    Caribbean Nations Unite to Harness Geothermal Energy Potential

    December 12, 2025

    U.S. Pushes to End Reliance on Chinese Lidar Technology

    December 12, 2025

    Trump Moves to Block Broadband Funds Over State AI Regulations

    December 12, 2025

    December 11, 2025

    Financial Inclusion Revisited: Counting Lives Changed

    December 11, 2025

    DAE Reports Record Nuclear Power Generation and Scientific Milestones in 2025

    December 11, 2025

    Subscribe to News

    Get the latest sports news from NewsSite about world, sports and politics.

    • Astronomical Events
    • Space Missions
    • Industry News
    • Science
    StratNewsGlobal Tech
    Facebook X (Twitter) Instagram LinkedIn YouTube
    © 2025 StratNews Global, A unit of BharatShakti Communications LLP
    • About Us
    • Contributors
    • Copyright
    • Contact
    • Write for Us

    Type above and press Enter to search. Press Esc to cancel.